Westlake - Calvert City, KY
Column Insulation and Scaffold Project:
- The height of this tower is greater than 200' tall and is
the tallest structure in Western Kentucky.
- Triangle performed the insulation and lagging on this column.
- This engineered scaffold was erected by Triangle.
|
|
|
|
 |
Tennessee Valley Authority - Paradise Fossil Plant
Flue Gas Desulfurization Duct & Freeze Protection Project:
- Triangle partnered and provided the HVAC, process ductwork insulation &
lagging, process piping insulation, heat tracing and scaffold support for
this FDG system serving a 1350 MW coal fired unit in central Kentucky.
- This project was completed on time and without any lost time injuries or
restricted work days.
- The projects were performed under contracts to Bowen
Engineering and Advatech, LLC.
|
|
|
|
 |
Tennessee Valley Authority - Cumberland Fossil Plant
Control Bay Pressurization and Chiller
Replacement:
- This $1.8M project scope involved the installation of two
250 ton chillers, a 56 ton 100% outside air make-up system,
numerous air handlers, complete powerhouse chilled water piping
replacement, ductwork, controls and insulation. The scope also
included all structural steel platforms, 6.9kV and 250V power
and associated switchgear.
- All the work was performed without interruption to normal
plant operations.
|
|
|
|
 |
Tennessee Valley Authority - Kentucky Lake Hydroelectric Dam
Building Controls and Life Safety Upgrades:
- The project scope included the change-out of an 80 ton
chiller and the replacement of pneumatic controls with a
complete Honeywell DDC system including control damper
replacements. The life safety portion included installation of
multiple fire dampers, pressurization & exhaust fans and
controls.
- The work was completed in three phases in order to allow
uninterrupted cooling and control to the customer.
|
|
|
 |
Ameren - Grand Tower Station
Re-Powering Project:
- Two Westinghouse gas turbines were added to turn two new
generators and each turbine's exhaust was recovered in HRSG
units which generated steam to drive the two existing
generators.
- Triangle was responsible for the insulation and sheet metal
work on this nearly $9M project performed under contract with J.
A. Jones of Charlotte, NC.
|
| |
|
 |
Massac County High School
HVAC Replacement and Upgrade:
- This project was performed under an accelerated schedule.
The entire job was completed during a 12 week period (summer
break).
- The project included 3 package units (70 tons total), 170
tons in 63 water source heat pumps, 4 energy recovery
ventilation systems, a cooling tower and a boiler.
- All the domestic water piping was replaced.
|
| |
|
 |
Arkema - Refrigerant Plant
Insulation project:
- This project consisted of 12,000 liner feet of
process piping and numerous pieces of equipment utilizing mostly Foamglas
insulation and stainless steel jacketing.
- Custom removable blanket fabrication and scaffolding support were
also provided.
|
| |
|
 |
Best Buy of Paducah, Ky
HVAC Project:
- This picture shows 1 of 10 air conditioning units being set
by a crane at the Kentucky Oaks Mall located at Paducah, KY.
- The roof top units ranged from 2 to 17.5 tons.
- We were also responsible for the ductwork servicing the
building.
|
| |
|
 |
Southern Illinois Power Coop - Marion, IL
Unit 4 SCR Addition:
- Triangle performed the insulation and lagging portion of
this project located at Marion, IL.
- This photograph records the SCR diverter duct's lift into
position.
- As you can see the duct was insulated and lagged on the
ground as were all the other ducts and SCR sections.
- Field joints were finished after the pieces were erected.
- This project was performed with J. S. Alberici of St. Louis,
MO
|
| |
|
 |
Marshall County Peak Power Station - Calvert City, Ky
Peak Power Plant:
- This facility was built near Calvert City, KY
for Duke Energy.
- Triangle's portion of the work included lining the exhaust
stacks and insulating piping and six large tanks.
- The demineralized water storage tank is shown in progress.
- This tank is 77 feet in diameter and 48 feet tall.
- This picture was taken before the aluminum lagging was
applied.
|
| |
|
 |
Harrah's Riverboat Casino
New HVAC Installation:
- This contract included the total HVAC installation for
Harrah's River Boat Casino located on the Ohio River at
Metropolis, IL.
- This project was reviewed in SNIPS a nationally
distributed industry magazine.
- The project amount was in access of $1M.
|