Projects

Ameren - Newton Power Station: Newton, IL

Spring Outage 2012 Triangle removed and replaced insulation on the Economizer sidewalls, replaced lagging, installed insulation and lagging on the boiler feed pump, and removed and replaced insulation on main steam lines. We also made insulation repairs on turbines, re-insulated high energy piping and misc. valves...

Read more...


American Electric Power: Madison, Indiana

Clifty Creek FGD Retrofit Triangle was responsible for insulating all duct joints, dampers, expansion joints, and 8000 feet of piping. Additional work included installation of four axial fans and HVAC for control buildings. All work was completed on schedule...

Read more...


Continental Tire: Mt. Vernon, IL

New Tank Farm Addition Continental Tire added six new 20' x 10' tanks to accomodate new mixers. Triangle added 4700 lf of insulation and lagging using 3" mineral wool and .016 lagging. Triangle also installed 6800 lf of 1 1/2" fiberglass piping insulation and aluminum jacket. Triangle also wrapped all of the duct for two new mixers, the heat piping, and ventilation as part of the firm's plant expansion...

Read more...


Daramic: Owensboro, KY

Maintenance Triangle took on the HVAC maintenance of Daramic's entire facility which consists of 90 units comprising over 500 tons of process cooling...

Read more...


Duke Energy IGCC: Edwardsport, Indiana

MP5 Water Treatment Plant Triangle insulated 8000 linear feet of pipe and 13 tanks/vessels. We also fabricated and installed removable blankets on pumps and flanged items. Work on the project was completed with no lost time injuries. MP6 Gray Water Insulated 40,000 lf of pipe with mineral wool and 016 coated aluminum with stainless steel bands. Insulated 1800 lf of duct from 66" to 8" with mineral wool and 024 aluminum attached with stainless steel bands. Insulated 23,000 SF of equipment with mineral wool and 024 aluminum attached with stainless steel bands. Fabricated and installe..

Read more...


Honeywell 2: Metropolis, IL

A-Top Hydrofluorinator Reactor During the Spring shutdown, Triangle installed sheet metal shrouds, 30" stainless steel small duct, and an in-line heater. Triangle also insulated shrouds, duct, reactors, and piping tie-in points. Additionally, we fabricated and installed custom, removable insulation blankets for reactor heads...

Read more...


Lubrizol: Calvert City, Kentucky

HRHD Expansion Triangle performed the HVAC, Fire Proofing, and insulation on this phase two expansion. Triangle installed four roof-top air handling units for process cooling and two units for process ventilation. Additional work included fabrication and installation of 2000 feet of duct engineered to seismic specifications. All duct and pipe was insulated. Triangle also reworked existing facilities which consisted of removing existing duct, reheat coils, and ABC controls. Steam and condensate piping was also installed. Triangle also was responsible for fire-proofing all steel and insulat..

Read more...


Marion High School: Marion, IL

Renovation Marion High School added on to the existing facility in multiple phases. Triangle insulated the geothermal piping in phase 1; and insualted the plumbing, geothermal, heat, and ventilation in phases 3-4...

Read more...


Meldahl Dam: Augusta, Kentucky

Triangle provided & installed a complete ventilation system for the entire Powerhouse. Work included (2) 75 HP supply fans & (2) 50/60 HP exhaust fans for plant wide ventilation, (6) other area specific exhaust fans (10 HP and under) and (2) power roof ventilators. We also installed all associated ductwork including directly concrete encased “embedded” ductwork. Triangle also designed all associated HVAC controls. We provided (1) 30 ton split system air handler/chiller for conditioning of operations areas within the powerhouse. Work performed included all asso..

Read more...


Southern IL Healthcare Cancer Center: Carterville, IL

New Construction Triangle performed the insulation on plumbing, heating, and ventilation on this project. In total, Triangle installed 7100 lf of plumbing insulation; 6400 lf of heat piping insulation, and 1800 lf of duct insulation. Also installed chilled water, condensate, refrigeration, outside air and supply return insulation...

Read more...


St. Thomas Hospital: Nashville, Tenn.

MRI Renovation Triangle reworked existing facilities for the new MRI facility which included: fabrication of duct and installation, aluminum duct and air distribution for MRI room. Triangle completed the project in six weeks with no disruption of daily operations...

Read more...


TVA Bellefonte Nuclear Plant: Hollywood, AL

Administrative Building Refurbish Project Triangle provided HVAC service on the Administration building at this location. The existing building, which was built in the 1970’s was completely refurbished with all new HVAC equipment and duct work. Triangle set five new rooftop units ranging from 10-18 tons, four roof-mounted fans ranging from 400 – 5000 CFM, 27 variable air volume units, three air handling units, and two heat pump units. We also installed 4005 LF (15, 246 lbs.) of duct ranging from 6” round to 74” x 18”. Project duration was 4 ½ months...

Read more...


TVA Shawnee Plant: Paducah, KY

Unit #8 Precipitator Demo Triangle supplied and erected scaffolding and stair tower on the TVA Shawnee Unit #8 Precipitator demo project. We also provided scaffolding on the Unit #2 and Unit #7 projects at this location. The scaffolding was approximately 63’ in height...

Read more...


Westlake Chemical: Calvert City, KY

Ethlane Expansion Triangle provided insulation and scaffolding services on this expansion and feedstock conversion project in Calvert City, KY. Our craftsmen supplied and erected approximately 500,000 pounds of CupLock scaffolding for all trades involved in the project. Triangle insulators installed 20,535 linear feet of foam glass piping insulation in total. Triangle finished the work on time and safely. PVC Plant Expansion-Triangle insulators installed mineral wool insulation on the dryer, dryer piping, and recovery system. Approximately 10,000 square feet of insulation was install..

Read more...


Contact details

Phone: (270) 443-2424. One of Triangle's courteous receptionists will direct your call to the specialist that can best meet your needs. Or, if you prefer you may use the direct dial phone numbers listed below.

Fax: (270) 442-5409 / (270) 444-4963.

Corporate Contacts

J.P. Kelly
President & CEO
270.444.4944 :: E-mail :: V-card

Jack Brockman
Vice President of Field Operations
270.444.4960 :: E-mail :: V-card

Kent Buchanan
Vice President of Estimating & Support Services
270.444.4952 :: E-mail :: V-card

Brian Sayner
Marketing & Business Development
270.444.4946 :: E-mail :: V-card